Instructions and maintenance of high speed hot air Yanke hood
publisher:管理员 Release time:2023-11-06 Number of views:1order

How to use the Yanke hood purchased? How to maintain it to make it last longer?

>>>>

Equipment structure characteristics

Yankee hood is composed of high temperature and high speed impact gas hood and heat circulation system outside the hood.

1. The hood skeleton is welded with carbon structural steel and has excellent mechanical strength. The inner and outer panels are made of stainless steel or galvanized steel plate with strong high temperature and corrosion resistance (depending on the customer's paper machine). The inner and outer panels are filled with centrifugal glass fiber thermal insulation cotton, so that the cover body has good thermal insulation performance to prevent heat loss.

2. The nozzle and air duct are made of stainless steel plate material, which is specially designed and carefully processed, so that the nozzle can work under high temperature conditions for a long time without deformation and ensure uniform wind.

3. The gas hood adopts the combination form of left and right half hood, so that the equipment has the characteristics of simple installation and easy maintenance.

4. The use of fluid computing software calculation and simulation, scientific design and layout of the hood circulation duct, scientific selection of fans, full system flow field distribution, the selection of advanced heat recovery device, to achieve uniform air supply and save system energy consumption.


>>>>

Equipment installation

1. Check whether related lifting devices and equipment are firm and reliable before hoisting to prevent equipment damage due to hoisting.

2. Cover body installation pay attention to adjusting the height and position of the frame to ensure that the distance between the air cover nozzle fox face and the cylinder meets the technical requirements and the spacing is equal.

3. The support frame (seat) of the gas hood should be firmly installed, and the sliding device should rotate flexibly without jamming interference.

4. The air duct is connected tightly and firmly, and should be strengthened and supported, and heat preservation treatment should be done.

5. The fan shall be constructed according to the relevant installation technical requirements of the fan.


扬克气罩2.jpg


>>>>

Equipment debugging

1. Shandong Yanke Hood debugging steps:

① Check whether the connections are firmly and reliably connected, whether the sliding device is greasing, whether the electrical power line is safe and reliable, and whether the instruments and meters are working normally (especially whether the cylinder air pressure reaches 0.4-0.6Mpa).

② First use the point method to debug the left and right half hoods, that is, open and close the left half hoods respectively, and then open and close the right half hoods respectively, that is, debug the half hoods respectively.

③ Check whether the apricot gas pipe is connected correctly to prevent the gas pipe of the left and right half cover from cross-connecting wrong.

④ The point method opens (closes) the left half hood and the right half hood again.

⑤ Open the left and right air hood successively, and then close the left and right half air hood successively.

⑥ At the same time, all open the left and right half air hood.

2.Fan commissioning steps:

① Close the inlet air regulating door and open the outlet air regulating door slightly.

② Check the clearance size of each part of the fan unit, the rotating part is not allowed to collide, and all fixing bolts should be tightened.

③ Check whether the bearing oil is sufficient and intact.

④For the coupling or the fan with transmission, it is necessary to check whether the coupling or pulley and belt are installed reliably, and whether the coaxial degree of the fan shaft and the motor meet the technical regulations.

⑤For fans with water cooling bearings, check whether the water supply of the cooling water pipe is good.

⑥Check whether the electrical wiring and instrument installation is correct.

⑦In the motor starting process, should strictly check the operation of the unit, found that there is a strong noise or violent vibration, should immediately shut down, check the cause, and then eliminate.

⑧When the fan characteristics reach the normal state, gradually open the inlet regulating door until the specified load is met.


>>>>

Equipment maintenance and maintenance

① The surface of the equipment should be kept clean to ensure a good heat exchange effect: after a period of use, dust and dirt on the fin can be washed with water, generally a thorough cleaning once a year; As far as possible, the fresh air inlet is provided with a filter to ensure the cleanliness of the fresh air through the heater surface and reduce the disassembly and cleaning work of the heater.

② After the heater is used for 2 to 3 years, chemical cleaning agents should be used to remove the scale in the inner cavity.

③ When used for a long time, such as leakage at the welding of the steam nozzle and the heat exchanger shell, the E4303 electrode can be welded, and the welder who holds the welding qualification of the pressure vessel can weld the leak, and then the hydraulic test (the test pressure is 1.25 times the working pressure).

④ When leakage occurs at the connection between the finned tube and the tube plate, the heater needs to be replaced.


FOSIN

Shandong Fengxin Technology Development Co., Ltd. is a company specializing in the development, research and production of paper ventilation, drying, energy saving technology and equipment, and has achieved good results in the field of paper ventilation, drying and energy saving for many years. Fengxin closed air hood system design mainly includes the drying part closed air hood, air hood in various functions of the blower, waste heat recovery device, paper machine mesh moisture, high-speed Yanke hot air hood, all kinds of coating drying boxes, workshop ventilation system and supporting equipment.